Project: EH-SlingTSI   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Edward Hefter   -  
Project:   The Airplane Factory - Sling TSi   -   VIEW REPORTS
Total Hours:483.65
Total Flight Time:
Start/Last Date:Sep 22, 2020 - No Finish Date
Engine:Rotax 915iS
Propeller:Airmaster 3 Blade Constant Speed propeller
Panel:G3X
 
Friendly URL: https://eaabuilderslog.org?s=EH-SlingTSI

Home or Last Project Picture

May 05, 2022     Parachute Rocket Cover Skin - Quickbuild problem 2 - (3 hours)       Category: Fuselage
The second problem I ran into with the Quickbuild doing some parts but not others (for example, riveting things together but not putting in the rivnuts) is on the cover that goes over the parachute rocket. The Sling factory made beautiful holes for the rivnuts so I didn't need to drill them out, but there is no room to get any kind of rivnut puller in there. After talking with the Sling factory, I ended up with the choice of de-riveting everything and putting in the rivnuts, or just putting new holes in for the rivnuts a little lower. I opted to drill more holes. It is just a cover, after all.

The lower 8 rivnuts were easy, the top 2 were a little harder (even with the lower holes), but they all got in. It is hard to see where the screws are vs. where they should be, so I've included pictures and a marked up drawing.

Time to move on to next steps of this build!


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.